Portfolio prototype — Northwind Telecom is a fictional company and every name, cost, and server here is generated sample data.

MSA3A

Mesa, AZ

Details

Cluster:MSA3A
Data Center:Mesa AZ
Servers:37
Health:G 96.7

12-month consumption

1000
Servers
37
Utilisation
32.1%
Health
96.7
Instrumented
7
Utilisation
Cluster average32% consumed
Build pipeline
Physical BuildComplete
Integration/ShippingComplete
HW ValidationComplete
Network ConfigComplete
EVT-AQAComplete
NC SW DeployComplete
Server List (7)
ServerTypeYearUtilisationStatus
nw-srv-4030Physical201838%Design
nw-srv-4035Physical201028.8%On Network
nw-srv-4086Physical201591.5%Build
nw-srv-4098Virtual201078.7%On Network
nw-srv-4114Virtual201170.6%On Network
nw-srv-4120Virtual201354.7%On Network
nw-srv-4127Physical201158.6%Design